When I started work on my project the project size was 1.15 GB but after I deleted some unnecessary files and made a checkpoint the size became 2.36 GB even though there are less assets than there were before I am not aware whether this issue began after I made a checkpoint or before but I noticed the problem when my project started to take too much time to load.
Can anyone on playcanvas team please check whether this is an issue from our side or playcanvas.